
|
 |
More
than 100 years on earth........80 years in Thailand
It is upon a solid foundation of experience that the
Christiani & Nielsen Group has built its enviable
reputation for completing professionally engineered
projects on the time and within budget. Professional
people : More than 2,000 people are now employed within
the Christiani & Nielsen Group. A large resource of
expert engineers, managers, technicians and artisans who
are contributing their expertise and commitment to
service to Christiani & Nielsen projects around the
world. A pool of international skills and experience is
thus combined with intimate knowledge of local market
conditions.
Project records in last 10 years
Project records in last 5 years |
|
Industrials |
 |
General Motors / Adam Opel Motor Vehicle Manufacturing
and Assembly Plant,
Rayong, Thailand
Phase I / II / III.
Comprised site preparation and earthworks. Overall site of 481,100 m2
required 536,977 m3 excavation, cut and fill and with
6,000 lin. mtr. of drainage. Piling and foundation works
with 5,057 No. 400 mm square pre-cast piles; 798 No. 600
mm dia. spun concrete piles; 6,092 m3 R.C. pile caps and
ground beams. Building structures including 15 No.
Buildings with GFA 60,000 m2; 146,107 m2 roofing &
cladding; Site Infrastructure included 76,100 m2
concrete roads, 25,500 m2 asphalt roads, 8,850 Lin.
mtr. concrete storm water drainage ditches, 2,600 lin.
mtr. fencing, landscaping, etc. M & E works comprised
detail design, installation and commissioning of
mechanical site utilities.
more... |
|
|
 |
Advance Agro Pulp And Paper Mill,
Prachinburi, Thailand The construction comprises 60,000 m2 Paper
Mill, 26,000m2 wood chip mill yard, 8,000m2 Pulp Mill,
3,700m2 boiler Power Plant, Chemical Plant, Plant, Pipe
Bridge, Purac Process Water and Effluent treatment
Plant, 11,000m2 Maintenance Work-shop and
Administration Office with a total project floor area
of 131,900m2.
more... |
|
|
 |
Thai Asia Pacific Brewery,
Pathumthani, Thailand
Construction of civil, structure, architecture and
M&E for Malt store, Brewery, Bottling Plant 9,564m2,
Office 400m2, Canteen 500m2, Truck depot 120m2,
Porters Lodge, Control Building 128m2, External
Paving 3,610m2, Drainage, Fencing and Gate.
more... |
|
|
 |
Thai-Baroada Nylon-6 Type Cord Factory,Maptaphut,
Rayong, Thailand
Construction of 16 No. buildings for Nylon Tyre
Cord factory, comprising 7 major buildings of
between 4,000m2 and 8,000 m2, 2 No. buildings of 4
and 5 stories (17 m and 29 m high respectively) and
7 No. single storey buildings. Fabrication and
erection of 3,700 tones structural steelwork with
additional pipe racks. External works, roads,
drainage and parking areas.
more... |
|
|
 |
ECCO Tannery, Ayutthaya, Thailand
Construction of a RC building with a total floor
area of 8,000m2; 700 tones steel roof structure; 5
concrete tanks central wastewater treatment plant; 2
control buildings and a canteen building.
Scope of works included full mechanical, sanitary
and electrical works. Installation of
mechanical process equipment was included.
External works comprised concrete car parks;
landscaping; drainage; street lighting.
more... |
|
|
 |
Star Refinery Buildings, Maptaphut, Rayong,
Thailand
Design and construct structural, architectural and
M&E works to more than 50 No. buildings including
the Central Control Building, Laboratory,
Maintenance/Warehouse, 11 No. substations, 7 No.
Operator Shelters and 34 No. small buildings.
Total area of building 16,672 sq.m.
more... |
|
|
|
 |
New Catering for Bangkok
Airways, Suvarnabhumi Airport, Thailand
A 3 storey buildings with
144m. x 139m. foot-print area including basement and
mezzanine floor.
more... |
|
|
|
 |
Ground
Service and EquipmentBuilding for Bangkok Airways,
Suvarnabhumi Airport,
Thailand
A 3 storey building with
100m. x 77.5m. foot-print area with one basement . Scope
of works were earthworks, structural, architectural,
M&E, external works, and landscaping works.
|
|
|
|
 |
CP
7-11 New Distribution Center,
Ladkrabang, Bangkok, Thailand
Construction of a single
single storey distribution center with approx. of 20,500
m2 and 3 storey office building with area of 9,500 m2.
Works include Concrete road, Asphaltic pavement parking
space, site drainage system, underground water tank, and
fire pump room.
more... |
|
|
|
 |
Silos and Feedmill
for Capital Cereals Co., Ltd.
Silos and Feedmill for
Capital Cereals Co.ltd (STC Group) at Bangsai,
Ayudhaya.
more... |
|
|
|
 |
Wet Bin
& Meal Silo and Feed mill for Chareaon Phokpan(CP),
Korat, Thailand The biggest
Concrete Silo in Asia. CNT constructed :
- Wet Bin & Work house
size 15.1m. x 11.4m., 48m in height with Slip form
method and Workhouse Structure (Silos) 50m x 37m,
48m in height approx. area of 15,400 m2.
- Feedmill & Mill Silo; Concrete
Feedmill Storage Bins 36m x 18m x 60m high, Soya Bean
Silos (3 no.) 15.6 dia. x 30m high, Feedmill Warehouse
13m x 18m x 17m high.
more... |
|
|
 |
Thai Dairy Plant Relocation, Autthaya, Thailand
Design and Construction of a new dairy facility,
comprising Process Areas (8,000 sq.m.), Warehousing
(19,000 sq.m.), mezzanine level Laboratory and
office (750 sq.m.), Administration Offices (750 sq.m.),
Amenity Building (900 sq.m.) and Services Areas
(6,000 sq.m.)
|
 |
|
General Buildings |
|
 |
Innovated
Saranrom Palace
Renovation existing Saranrom
palace, Bangkok, 2008- 2011
more... |
|
 |
|
 |
Visual Art Centre for Bangkok Pattana School
Construction of new 3-storey
with a single level basement and steel roof truss with
metal roof sheet.
more... |
|
 |
|
 |
Chula Sport Complex, Chulalongkorn University
Indoor sport building
and Outdoor sport Building.
more... |
|
 |
|
 |
Chulalongkorn Hospital's 14 storey Medical Centre
Design and Construction
work of new 14-storey medical service center.
more... |
|
 |
|
 |
Work Point Entertainment PCL.
New Studios and Head Office
for Work Point Entertainment PCL. Rangsit, Pathumtani.
more... |
|
 |
 |
Sociology Buildings Thammasart University,
Rangsit Campus, Thailand
Construction
of 6 No. RC framed buildings. Scope of works includes
all civil, structural, architectural, M&E, Landscape
works and drainage. Building include: Lecture
Building (Phase 1) 28,300 m2, Office Building
17,230 m2, Media Training Centre 7,020 m2,
Canteen Building 2,070 m2, Walkways and footpaths
15,000 m2, Roads 3,600 m2, Car
Park 3,600 m2. Approximately total
of 56,200 m2.
more... |
|
 |
 |
Surat Osathanugrah Library, Bangkok University,
Rangsit Campus, Thailand
Construction of 5-storey in-situ concrete structure,
pre-cast and aluminum curtain wall with an overall gross
function area of 19,900 m2. A symbolic
structural steel feature is located above the main atrium.
First floor 5,800 m2 provides lending and
reading rooms, soft-scape interior landscaping, food
and beverage zone. Second floor comprises 3,000
m2 chambers and exhibition halls. Third
and fourth floor together 9,600 m2 provide
theatre, convention hall, foreign language studios.
Fifth floor is for administration, reading IT and research
facilities. Building M&E services are included
in the scope of works.
|
|
 |
 |
ST. Francis Xavier School, Muang
Thong Thani, Bangkok
Construction of new school building comprising 3 storey
9,258 sq.m multifunction kindergarten building including
swimming poll, stores, laundry, multipurpose hall, dormitory,
family rooms, toilets. Also 3-storey counselor building
643 m2 and external works included swimming
pool, tennis court, basketball court, roads and landscaping.
|
|
 |
 |
Veterinary Clinical and Zoological
Science Building, Mahidol University, Salaya Campus,
Thailand
Construction of 9-storey building with area of 17,770
sq.m plus 2-storey and 1-basement building with the
area of 9,870 sq.m. Work included bored piling,
RC structure, all architectural finishing, M&E works
and external roads and landscaping.
|
|
 |
 |
150 Years Building, Bangkok Christian
Collage, Bangkok, Thailand
Construction of 19-storey new school building with 2
level basement with a total floor area of 23,780 m2.
Scope of works included Basement, Wastewater Treatment
and Fire Water Tank, Structural, Architectural, Sanitary,
Fire Protection and External Roads, Access.
|
|
|
|
Royal
Banquet Hall at Phuphan Palace, Sakol Nakorn, Thailand
Construct
buildings on rock plate contour comprising of Royal
Banquet Hall 2-storey with basement (1,800 sq.m),
Royal Cabin on steel structure (330 sq.m), Wood Patio
on steel substructure (220 sq.m) service road (300
sq.m.)
more...
|
|
|
 |
Privy Council Office Building, Bangkok, Thailand
Construction of 3-stroey with single basement office
building with GFA of 8,000 sq.m including 5-star interior
works and M&E works. All external works included
roads, parking, drainages are in the scope of work.
|
|
| 
|
 |
Queen's Palace At Leam Hang Nak, Krabi, Thailand
Construction of 4-storey building with total area of
5,500m2 including Reception Hall with full
Banqueting Hall and Kitchen. Palace included Private
Residential Suites, additional guest accommodations,
dining, services, staff accommodation, garaging, security
facilities. Full M&E installation included.
|
|
|
 |
Exhibition Centre
for Tourism Authority of Thailand, Chiangrai, Thailand
Construction of concrete framed buildings
comprising 3 storey Exhibition Centre of 11,000m2;
Reception and
Ticketing building 950m2; 420m2
Access tunnel was cut through stiff clay and gahnite
lined. Extensive geotechnical design and engineering
was undertaken for the foundations which were cut into
severe slopes. External works include 7,900m2
car parking area including walkways; landscaping; gardens
and ornamental ponds totaling 216,000 sq.m and access
roads.
|
|
| 
|
| 
|
New International School Of Thailand (NIST),
Bangkok, Thailand
Construction of piling, structural and architectural
works for Early Years Centre comprising 40x37m single
storey building classroom complex. Sports Complex
comprising 40x37m storey building. New Swimming
Pool 25x23m. Project includes M&E works.
External works including roads, car parking, drainage
and landscaping. Total GFA approximately 10,000
sq.m.
|
|
| 
|
SCB Park Plaza Phase
II & III, Bangkok, Thailand
Construction of 4 No. buildings of 26, 21, 17 and 6-storeys.
Gross area of 192,000 sq.m. and 10,500 sq.m. of retail
& restaurant facilities on a 38,500 sq.m.
Underground car parking for 0ver 1,600 cars is provided
in 4 levels.
|
|
| 
|
All Season Place (Phase
I, II & III), Bangkok, Thailand
Construction of multi-tower high-rise development.
Phase I - 35-storey tower 130 m. high overall comprising
a 7-storey podium and 28-storeys with 180 condominiums
with a gross area of 55,950 sq.m. Phase II &
III each comprise 28-storey office tower block 140 m.
high overall with 40,352 sq.m. An average floor-to-floor
cycle of 4 days were achieved on the construction of
Phases I & II respectively, while record 3-day floor-to-floor
cycles were achieved on Phase III. Works also
included structural, architectural and finishing works.
|
|
| 
|
Siam Administration Management Co., Ltd. New Office,
Bangkok, Thailand
Construction of 11 new office buildings with total area
of 11,921 sq.m. Scope of works included site-clearance
and bored pile, earthwork, structure and architectural
works, M&E, also external works which included roads,
parking area, drainage, flood protection dyke, RC boundary
wall, underground water tank, car wash area and basket
ball court.
|

|
|
Roads / Bridges, Civil / Marine |
 |
Highway Route No. 403 A. Ron Phiboon-Nakhon Sri
Thammarat, Thailand
Rehabilitate and upgrade 31.3 Km. of existing road
to 4-lane divided provincial highway standard.
Principal quantities embankments 563,000cu.m.
selected materials 202,200cum.m. sub base
138,200cu.m. Soil-cement base 148,050cu.m. Asphaltic
concrete 167,640 tones, RC bridge, slab type
906lin.m. RC bridge, girder type 1,616lin.m.
|
|
|

|
 |
Highway Route No. 11 Lampang - Lamphun, Thailand
Construction of 10.1 Km. 4-lane concrete highway
comprising excavation earth 113,400 m3, excavation
soft rock 165,640 m3; excavation hard rock 154,420
m3; embankments 347,200 m3; sub-base 38,300 m3;
crushed rock 28,000 m3; 250 mm concrete pavement
166,500 m2; RC box culverts 655lm; reinforced soil
18,600 m3; soil nailing 6,300 m3; anchor retaining
wall 9,600 m2; chemical rock bolts 3,000 No.;
concrete crash barrier 22,710 lm; RC drainage ditch
14,165 lm.
|
|
 |
|
Bangkok Wastewater Treatment
Plant - Stage I Mitmaitree Road, Bangkok,
Thailand
Construction of the Waste Water
Treatment Plant capable of providing treatment
for dry weather flow of 350,000 cu.m/day.
Because of the limited site area, the Treatment
Plant is designed on two levels. The lower level
contains the Solids Processing Area and
Secondary Treatment Tanks, the latter having a
storage capacity of 95,000 cu.m. On the upper
level are 15 No. 30 m diameter x 6 m deep
Clarifier Tanks and associated distribution
channels.
more...
|
|
|
 |
Interchange Buddhamonthon
Highway 338
Bangkok, Thailand
Construction of 1
Elevated Bridge 269m long; widen
existing bridge from 11m to 24m; 2 new
klong bridges; 5 elevated access ramps;
6 km x 21m wide road at grade. Principal
quantities included 475,000cu.m
earthworks; 65,300cu.m sub-base; 132,500
sq.m asphaltic concrete surfacing;
110,000sq.m x 250mm thick concrete
paving; 4,100m box culverts; 5,780m pipe
culverts;; 4 bus shelters; 1 traffic
light management system; street lighting
and installation of new mains water
transmission main alongside road.
more...
|
|
|
 |
Sarasin Bridge, Phuket, Thailand |
 |
|
Leisure & Resorts |
Sport & Leisure |
 |
13th Asian Games - Main Stadium, Thammasat
University, Rangsit Campus, Thailand
Design and construction of the Main Athletics and
Football Stadium with associated pedestrian plaza
and landscape work. 20,000 all seat stadium
with athletics track to IAAF/IOC standards and with
a FIFA football pitch. 49,000 sq.m back of
house facilities including Officiating Rooms, Drug
Testing, Time/Score Computer Systems, Change Rooms,
Canteens, FF&E, M&E including Electronic Scoreboard,
Sports Lighting, PA Audio System and Sports
Equipment.
|
|
 |
 |
13th Asian Games - Aquatic Centre & Athletic Stadium,
Thammasat University, Rangsit Campus, Thailand
Design and construction of 6,000 seat Aquatic Centre
comprising three FINA standard pools - competition,
diving, warm up / water polo, 39,000 m2 back of
house facilities, including Officiating Rooms, Drug
Testing, Time/Score Computer Systems, Change Rooms,
Canteens FF&E, M&E, Lighting, Audio and Electronic
Scoreboard.
|
|
|
|
Fashion Island, Bangkok, Thailand
Construction of 4-storey, 350,000 sq.m. shopping
and commercial centre with a one-level basement.
Works included two 6-level car parks each with a
one-level basement, 1.4 kms. of perimeter road,
internal and external landscaping, a there park, and
6,000 sq.m. of tensioned membrane roof.
|
 |
Hotel & Resorts |
 |
Beaufort Sukhothai Hotel, Bangkok, Thailand
Construction of a five star, 9 and 5 storey
luxurious hotel. The 227 room hotel combines
traditional Thai style with the highest
international standards. Room Mix : 1
Ballroom, 109 Superior Rooms, 37 Deluxe Rooms, 37
Executive Suites, 25 Deluxe Suites, 13 Garden
Suites, 4 Terrace Suites and 1 Sukhothai Suite.
|
|
 |
 |
Sheraton Krabi Beach Resort, Krabi, Thailand
Construction of 5-star resort hotel with 246 suites
in 8 No. 3-storey blacks, Central hotel building
with restaurants, bars, reception, back of house
facilities, health centre with Tennis courts,
swimming pool with deck and spa, staff housing, M&E
building, pump house, water tower tank, sub-station,
wastewater treatment, extensive landscape, covered
walkways, external works including roads, drainage
and perimeter security. Total area of building
18,035 sq.m.
|
|
 |
|
 |
Santi Pura Resort
Condominium, Hua Hin, Prachubkirikhan, Thailand
5 stars Low-rise
condominium at Hua-hin.
|
|
|
 |
South Sea Pakarang Resort & Spa, Phungnga,
Thailand
Structural and architectural works for 136 unites of
4-star resort with GFA 10,000 sq.m. Scope of
works included M&E works, landscape (hard-scape),
interior finishing works and external roads, parking
drainage and security.
|
 |
|
|
Petrochemical/Oil-Gas |
 |
Outside Interconnecting Pipelines Project, Maptaphut Industrial Estate, Rayong, Thailand
Engineering, supply, construction and
pre-commissioning (EPC) contract for approx. 204 km
steel pipelines in various sizes.
|
|
|
 |
PTT Chemical New Pipe Pack (I-1 Road), Maptaphut Industrial Estate, Rayong, Thailand
Design &
Construct new pipe rack & pipe bridge with
foundations 660m long supporting 8m intervals.
|
|
|
 |
Site Preparation works for Gas
Separation Plant No.6, Rayong, Thailand
Demolition
& removal of existing utilities : fire fighting
pipeline, instrument &electrical cables, building,
trees, soil stockpile.
Scopes
are clearing 20,000 cu.m/excavation 12,000 cu.m/embankment
100,000 cu.m /new construction for fire fighting
pipe (2,370m.)/raw water pie (860m.)/instrument
signal cable (1,540m.)/electrical cable.
|
|
|
 |
PTT Phenol Plant(Utility Buildings), Eastern Industrial Estate, Rayong, Thailand
Construction substation building/control
building/laboratory/foam tank/fire pump house/compressor
shelter/ WWT control room/IA-PA House/ and refrigeration
house. CNT's works also include building services M&E,
sanitary, and equipment footing/foundations..
|
|
|
 |
PTT Chemical Head Office Building, Maptaphut, Rayong Thailand
Construction of new 6-storey head
office with approx 21,000 sqm.
|
 |
|
|
|
CHRISTIANI
& NIELSEN (THAI ) PUBLIC COMPANY LIMITED
451 La Salle Road (Sukhumvit 105), Bangna, Bangna, Bangkok 10260, THAILAND,
Tel: + 66 2398-0158, Fax: +66 2398-9860, +66 2744-5835 |
|